© 2017 by Faisant Associates. Proudly created with Wix.com

EDUCATION

© GWWO Inc./Architects

Wheaton Woods Elementary School

Wheaton, Maryland

 

New 120,000 sq. ft. elementary school building, housing classrooms, computer lab, media center, gymnasium and multi-purpose room.  The building structure is a combination of steel frame construction and precast floor planks with load bearing masonry walls and spread footing foundation.  The building is currently under design.

 

Approximate Cost:  $33.4 million

 

Architect: GWWO Inc./Architects

1/1
Lyons Mill Elementary School

Ownings Mills, Maryland

 

New 90,000 sq. ft. elementary school building, housing classrooms, computer lab, media center, gymnasium and multi-purpose room.  The building structure is a combination of steel frame construction and precast floor planks with load bearing masonry walls and spread footing foundation. 

 

Approximate Cost:  $21.6 million

 

Architect: GWWO Inc./Architects

© GWWO Inc./Architects & Faisant, Inc.

 

Henderson-Hopkins School

Baltimore, Maryland

 

New high performing 125,000 sq. ft. 7-acre school complex for levels K – 8 that includes classroom wings, gymnasium, auditorium, servery, library and playing fields. Facility will also serve local community functions.

 

Approximate Cost:  $53 million

 

Architect: Rogers Marvel Architects

© Rogers Marvel

1/1

© GWWO Inc./Architects & Faisant, Inc.

Severna Park High School

Severna Park, Maryland

 

New 358,000 sq. ft. facility comprised of one, two, and three story elements housing classrooms, computer lab, library, cafeteria, auditorium and gymnasium.  The project also includes new athletic fields with stadium seating, locker room, maintenance, and concession buildings.

 

Approximate Cost:  $94 million

 

Architect: GWWO Inc./Architects

 

STEM Building, Community College of Baltimore County 

Baltimore, Maryland

 

New 358,000 sq. ft. facility comprised of one, two, and three story elements housing classrooms, computer lab, library, cafeteria, auditorium and gymnasium.  The project also includes new athletic fields with stadium seating, locker room, maintenance, and concession buildings.

Approximate Cost:  $34  million

 

Architect: GWWO Inc./Architects 

©  Community College Balt. County

 

School of Medicine, Johns Hopkins University 

Baltimore, Maryland

Projects including research lab renovation, animal facility, supports for various imaging lab equipment, analysis of the existing floor and roof structure for new equipment, supports for new ceiling hung equipment and structural modifications for mechanical units.  Several renovations and infrastructure upgrade projects of various size for Traylor building, Ross research building, Wood basic science building, Physiology building, State theatre building, Hunterian building, Turner building, Preclinical building, Broadway research building, Allergy and Asthma Center and Reed Hall. 

Architect:  Johns Hopkins University Design & Construction Department 

©  Johns Hopkins University 

1/1

© Faisant, Inc.

Morgan State University Center for the Built Environment & Infrastructure Studies

Baltimore, Maryland

 

A brand new center with 32 classrooms, laboratories, seminar rooms and 88 offices accumulating to 126,000 sq. ft. for Morgan State University. The building consists of four floors, with one level below grade.  The structure is framed with steel columns and composite steel beams for elevated floors and with steel brace frames for lateral resistance. 

Approximate Cost:  $55 million

 

Architect: Hord Coplan Macht